Authors
- Norazlin Mat Salleh
- Shahela Mamter
- Syarifah Nur Nazihah
- Mohd Hafiz Saberi
- Nurul Iman Mohamad Fadzili
DOI:
https://doi.org/10.24191/myse.v11i3.3898Keywords:
Flood, Construction industry, Impact, Construction siteAbstract
Flooding is an unexpected phenomenon that happens throughout the year in Malaysia and has become very common. The yearly recurrence of floods has had a significant influence on the lives of humans and other living beings specifically at the construction sites. Due to the negative impact of floods, awareness must be given careful consideration. The purpose of this research is to identify the impact of the flood occurrence on the construction sites. The initial research begins with a literature review from various scholars on key areas of flood and the impact of flood on construction sites. The next stage was of obtaining the data was though primary data. The research instrument was a set of questionnaires. The questionnaires were divided into two sections A – Demographic Questions and B – The impacts of flood. Questions for Section B used five Likert Scales strongly agree to strongly disagree. All the data were analysed using SPSS software, on the frequency and descriptive analysis. The respondents were contractors in Grade 7 (G7) registered with the Construction Industry Development Board (CIDB) in Selangor state. A total of 146 respondents participated in this research. This research identified five impacts of flood occurrence in construction sites. There are reconstruction and maintenance of the building structure, safety of labour, the cost of reconstruction, the defects to the building structure, and construction delays. All the construction stakeholders need to be aware and prepared with the flood occurrence to avoid from losses and delays to construction project.
References
Aminorlah A.I., Rahim N. A., Mohamed Z., & Mazlan A. N. (2023). Critical delay factors in typical physical projects: The case of the Ministry of Home Affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), 57–79. https://doi.org/10.21315/jcdc-01-22-0014
Andersen, B., Samset, K. & Welde, M. (2016). Low estimates – high stakes: underestimation of costs at the front-end of projects, International Journal of Managing Projects in Business, 9, (1), 171-193.
Ashworth, M., Ahmed, S., Azhar, S., Castillo, M., & Kappagantula, P. (2022). Construction delays in Florida: An empirical study Department of Statistics Malaysia (2023). Special Report on Impact of Floods in Malaysia 2022. Ministry of Economy Department of Statistics Malaysia
Bhat, A. (2020). Data Collection: Definition, methods, example and design. Retrieved from: https:// www. questionpro.com/blog/data-collection.
Bhuiyan T. R., Reza M. I.H., Choy E. A. & Pereira J.J. (2018). Direct impact of flash floods in Kuala Lumpur City: Secondary Data-Based Analysis. ASM Science Journal, 11(3), 145-157.
Collins, J. (2021). A definition of research instruments and their purpose in obtaining data from research subjects. Retrieved from: https://www.impactio.com/blog/a-definition-of-research-instruments-and-their-purpose-in-obtaining-data-from-research-subjects.
Department of Statistic Malaysia. (2021). Special report on impact of floods in Malaysia. Retrieved from: https://www.dosm.gov.my/portal-main/release-content/special-report-on-impact-of-floods-in-malaysia-2021
Escarameia, M. Tagg, A. Walliman, N. Zevenbergen, C. & Anvarifar, F. (2012). The role of building materials in improved flood resilience and routes for implementation.
Fassin, Y. (2020). The average citation ha-index. International Society for Scientometrics and Informetrics. ISSI Newsletter, 16(4), 64-70.
Fateh, D. M. A. M. (2022, February 28). Isu kelewatan projek pembinaan. Sinar Premium. Retrieved April 15, 2022, from https://premium.sinarharian.com.my/article/189629/mediasikritis/perspektif/isukelewatan-projek-pembinaan
Ishak A., (2022). Construction of ECRL project affected by floods. Bernama. Retrieved from: https://www.malaysiakini.com/news/649510" https://www.malaysiakini.com/news/649510
Ishak N.A., Dali A. M. & Razak M. R. A. (2014). Sejarah Banjir Besar di Semenanjung Malaysia, 1926—1971. Jurnal Perspektif, 6(3), 54-67. ISSN 1985 - 496X
Jha, A.K., Bloch, R. & Lamond, J. (2012). Cities and flooding: A guide to integrated urban Flood Risk Management for the 21st Century. World Bank Publications.
Luino F., (2016). Floods. Italian National Research Council. Retrieved from: .https://www.researchgate.net/publication/312571013" https://www.researchgate.net/publication/312571013
Mahamid, I. (2015). Factors affecting cost estimate accuracy: evidence from Palestinian construction projects, International Journal of Management Science and Engineering Management, 10(2), 117-125.
Merz, B., Kreibich, H., Schwarze, R. & Thieken, A. (2010). Review article assessment of economic flood damage, Natural Hazards and Earth System Sciences, 10 (8), 1697.
MoF (2021). Govt allocates RM200 mln to address flood impact – Tengku Zafrul. Press Citation. Retrieved from: https://www.mof.gov.my/portal/en/news/press-citations/govt-allocates-rm200-mln-to-address-flood-impact-tengku-zafrul
Muhamad, N. & Shaidin, H.A. (2022). The Assessment of Flood Events in Selangor, Malaysia. Journal of Advanced Geospatial and Science Technology. Vol. 2 No. 2, 42-55
NADMA. 2021. National Risk Register. Putrajaya: Prime Minister’s Department of Malaysia
Rahikkala, J., Leppänen, V., Ruohonen, J. & Holvitie, J. (2015), "Top management support in software cost estimation: a study of attitudes and strategies in Finland". International Journal of Managing Projects in Business, Vol. 8 No. 3, 513-532
Rahman S. (2022). Malaysia’s Floods of December 2021: Can future disasters be avoided. Yusof Ishak Institute Analyse Current Events. Issue: 2022 No. 26. ISSN 2335-6677
Relief Web. (2022). Malaysia – Floods and landslides, update (NADMA, Met Malaysia, media (ECHO Daily Flash of 3 January 2022). Retrieved from: fhttps://reliefweb.int/report/malaysia/malaysiafloods-and-landslides-update-nadma-metmalaysia-media-echo-daily-flash-3" https://reliefweb.int/report/malaysia/malaysiafloods-and-landslides-update-nadma-metmalaysia-media-echo-daily-flash-3
Saad M. H. M., Kamarudin M. K. A., Toriman M. E., Wahab N. A., Ata F. M., Samah M.A., Saudi A. S.M., Manoktong S. N. (2023). Analysis of the flash flood event and rainfall distribution pattern on Relau River Basin Development, Penang, Malaysia Planning Malaysia. Journal of the Malaysian Institute of Planners, 21 (1), 58 – 71.
Safapour, E., & Kermanshachi, S. (2019). Investigation of the challenges and their best strategiess for post-disaster reconstruction safety: Educational approach for construction hazards. Research Gate Publication, 1-8.
Sia, V., Satyanaga, A., & Kim, Y. (2022). Effects of heavy rainfall on shallow foundations in Bukit Timah Granite in Singapore. Applied Sciences (Switzerland), 12(19). https://doi.org/10.3390/app12199516
Taylor, J., Man Lai, K., Davies, M., Clifton, D., Ridley, I. and Biddulph, P. (2011). Flood management: Prediction of microbial contamination in large-scale floods in urban environments. Environment International, 37 (5), 1019-1029.
Vladkova. B. (2020). Best practices to improve construction site safety, in the specific conditions of processing plant building. MATEC Web of Conferences 305, 00014 SESAM 2019. 1-8 https://doi.org/10.1051/matecconf/202030500014
Williams, T. (2016). Identifying success factors in construction projects: a case study, Project Management Journal, 47(1), 97-112
Yusoff I.M., Ramli A., Alkasirah N. A. M, Nasir N. M. (2018). Exploring the managing of flood disaster: A Malaysian perspective. Malaysian Journal of Society and Space, 14(3), 24-36.
Zulkefle S. R. & Said S.A. A. S. S. (2023). Construction safety and health implementation for foreign workers in Malaysia. Journal of Building Performance, 14(2), 1-13. ISSN: 2180-2106